May 09 2019 - 14:05
Back

Importance of Mansourieh power lines installation that has been pending for years

The Mansourieh line of high-voltage power has a length of 1.9 kilometers Lebanon, news ,lbci ,أخبار Mansourieh,Lebanon,The Mansourieh line of high-voltage power has a length of 1.9 kilometers
episodes
Enjoy our online videos
A bit more details about our online video plans
Subscribe now
Sign in
Lebanon News

The Mansourieh line of high-voltage power has a length of 1.9 kilometers out of a total length of 385 kilometers of the 220 kilovolts power lines in Lebanon.

 
advertisement

This line, if completed, will link Deir Amar power plant with al-Zahrani plant, through the stations of Halat and Bsalim, passing through Mansourieh towards Aramoun station, all the way to al-Zahrani.

 

From the Mansourieh line, another line branches off towards al-Mkalles and then Beirut.

 

Completing the Mansourieh line contributes to reducing the technical waste by 1% out of 15%.

 

It also helps in ensuring stability to the power network in case of any malfunction that might hit one of the main power plants.

 
 

For more details, watch the full report in the video above

 

Read also